Want to sell foam boards to the ice - covered Russia?看似簡單的出口,實則暗藏玄機。GOST certification, Russian - language contracts, barter trade... A slight mistake may lead to a complete loss. Still having a headache about qualification approval? Being overwhelmed by the customs clearance process? Losing sleep over collection risks? Dont worry, a professional Russianforeign tradeagent will help you clear the obstacles and explore the market of the fighting nation!
Foam boardCompulsory certificationThe content and process design of the foreign trade agency service are as follows:
I. Core content of agency services
Apply for the Export License for Dual - Use Items and Technologies (for restricted metal materials)
Handle the one - time border trade operation right on behalf of the client
Apply for the Russian GOST - R certification (for EPS/XPS foam boards)
Handle the filing of Sino - Russian bilingual contracts (including barter trade terms)
Logistics and customs clearance support
Adopt the door - to - door customs clearance service (including the Russian SPBSERT certification)
Customize the shock - proof packaging solution (in line with the Russian Railway transportation standards)
Trade Finance Services
Operate barter trade settlement
ProvideExport DrawbackAgency (The drawback rate of foam board is 9%)
Factory inspection (Density ≥ 18kg/m3) Fire - resistance grade testing (B1 grade and above)
執(zhí)行GB/T 10801.1標準
Documentation preparation
1. 制作中俄文MSDS文件 2. 申辦FORM A產(chǎn)地證
Including the Russian HS code 3921199009
Cross - border transportation
Choose Manzhouli Port for customs clearance Insure against overland transportation all risks
Temperature - sensitive products (-20℃~50℃)
Dispute handling
Operation of the joint claim team Initiate arbitration procedures (preferably choose the Beijing Arbitration Commission)
Refer to the clause on the assumption of dispute settlement costs,
III. Risk management key points
Payment guarantee: Adopt 30% advance payment + 50% payment upon seeing the railway waybill + 20% final payment upon acceptance,
Legal compliance: Compulsory filing of the Russian EPD environmental protection statement (including the recycling mark)
Transportation monitoring: Install GPS temperature and humidity sensors (data is transmitted in real - time)
Note: The agency service cycle is usually 25 - 35 days (including a 15 - day production period). The green channel can be activated for urgent orders and shortened to 18 days.China-Europe Railway ExpressOne - stop foreign trade agency service for foam board exports to Russia | Shanghai Zhongshen International Trade Import and Export Agency Service